Description
Monongahela Valley Hospital (MVH) in Pennsylvania is a 226-bed, full-service healthcare facility with more than 1,100 employees. The hospital’s parking garage, after many years, was plagued by heavy use and damage from water infiltration and corrosion.
Products Used
The uppermost concrete level was reinforced with steel beams, existing cracks and repair joints were filled with PENECRETE MORTAR, and the underside of the concrete decks was waterproofed with two coats of PENETRON slurry.