Description
A state-of-the-art film and television studio production facility, the Pinewood Iskandar Malaysia Studios serve the Southeast Asia region as a film & TV production center with five stages, indoor water tanks, TV studios, workshops & post-production, outdoor studios and offices. With a relatively high water table, studios located close to a river and large underground pools, a solution to reduce concrete permeability under constant hydrostatic pressure and waterproofing containment of the water tanks was needed.
Products Used
Approximately 13,388m3 of PENETRON ADMIX were poured into the basement concrete structure, 2,008m2 of wet areas were treated with PENETRON and the 4,107m2 poured concrete roof was sprayed with PENESEAL PRO.