Description
The construction of the first reactor started in 1977, but was not completed until 2001 and the second reactor was finalized in 2009. The third reactor where the PENETRON System was used was finished in 2011. The fourth reactor should start running in the fall of 2016. The new upgraded station is supplying energy to Volgograd, Krasnodar and the Stavropol Regions.
Products Used
PENETRON materials were initially applied on the waste way (spillway canal) of the second energy reactor, pools and reservoirs in the fire department of the power plant. PENETRON was added for the hydro insulation of the sewage system, shore and the central pumping stations. PENETRON ADMIX was used while building the basement structure for the reserve power generators at 3&4 power generating units. The management of the Atomic Power Station has decided to use the PENETRON System for the construction of the third and the fourth reactors.