Description
The Amur Gas Processing Plant’s (GPP) six production lines (each producing 7 billion m3 of gas) are being constructed in phases to correspond with the development of Gazprom’s production capacities in the Yakutia and Irkutsk regions of Siberia directly to the north. The first two lines are slated for commissioning by 2021.
Products Used
The concrete foundations for the key facilities of the GPP were treated with PENETRON ADMIX to provide protection against the natural deterioration factors caused by the groundwater and extreme Siberian temperature swings. Added during the batching phase, PENETRON ADMIX becomes an integral part of the concrete matrix by forming insoluble crystals, making the concrete impermeable.