Designed by 3TI PROGETTI as lead designer, along with Ingegneri Guadagnolo & Partners and Servizi Integrati, the Andria Nord construction project encompassed not only submerging the Andria Nord railway station but also burying the city’s main railway line all the way to the renovated Andria Centrale station, resulting in a 3-km (1.8-mile) long tunnel that lies under the city center, as well as construction of the new Andria Sud station (above ground).
Products Used
The Penetron System products used in the Andria project included:
- PENETRON ADMIX – a crystalline waterproofing admixture which was added to the concrete mix for the tunnel walls and foundation
- PENEBAR SW – a swellable waterstop used to permanently seal non-movement concrete construction joints
- PENETRON – a crystalline waterproofing material applied as a slurry to prepared concrete surfaces