Education

Aquatic Center at the Century Middle School

Lakeville, MN, USA

Description

Added to the existing Century Middle School, the new Aquatic Center is housed in a two-story (20,604 ft2) building that includes an eight-lane, 25-yard competition pool, and a diving well with two diving boards. The first floor will host both pools, the women’s and men’s locker rooms, a pool office, and a multipurpose classroom. The second floor provides seating for 476 spectators, a concessions area, and an additional set of restrooms.


Products Used

The local Penetron representative worked with the DLR Group and Aggregate Industries, the concrete ready-mix supplier, to provide an optimal waterproofing solution. PENETRON ADMIX SB was used in pre-measured soluble bags to treat all the concrete pool structures. Adding one soluble bag of PENETRON ADMIX SB per cubic yard of concrete simplifies the batching process by not having to weigh the admixture prior to batching, resulting in uninterrupted concrete production.


Related Media Releases


February 3, 2022

New Aquatic Center for Lakeville, Minnesota Taps Penetron for Permanently Waterproof Pool Structures


Back to Projects

Products Used

PENETRON ADMIX SB

PENETRON ADMIX SB

Crystalline Waterproofing


Back to Projects