Description
Part of the Costa Pinto Bioenergy Park, the new R$ 300 million ($53.3 million) biomethane plant is located close to the Comgás gas distribution network, facilitating the delivery of biomethane to client facilities. The Piracicaba plant will produce up to 26 million cubic meters of biomethane annually.
Products Used
PENETRON ADMIX-treated concrete has reduced permeability and hairline crack self-healing abilities which increases the durability of the concrete by providing corrosion mitigation, increased chemical resistance, sulfate resistance and waterproofing. The PENETRON ARC coating protects concrete from exposure to the biogenic sulfuric acid (pH level less than 3) during the microbial induced corrosion process prominent during production of biomethane.
Related Media Releases
April 9, 2025