Water Treatment & Storage

East Water Reclamation Facility

Clermont, FL, USA

Description

The durability of concrete structures in a plant like the East Water Reclamation Facility depends primarily on stopping water, effluent, and chemicals from entering the concrete, even under constant exposure to hydrostatic pressure. PENETRON ADMIX SB-treated concrete is impermeable, which protects the imbedded reinforcement steel in the concrete from corrosion and resulting concrete deterioration.


Products Used

To keep pace with the steady increase in the city’s population, a $44.3 million project recently increased the treatment capacity of the East Water Reclamation Facility from 4.0 million gallons per day (MGD) to 6.5 MGD. The construction of new concrete structures included a new headworks structure (common wall with a flow equalization structure), a new biological nutrient removal reactor with anoxic and aerobic compartments, an internal recycle channel with a control gate, effluent weir, an 85-foot (26-m) diameter clarifier, effluent baffles and weirs, a new dual-chambered aerated sludge holding tank, etc.


Related Media Releases


August 13, 2024

Florida Water Reclamation Facility Specifies PENETRON ADMIX SB to Ensure Concrete Durability


Back to Projects

Products Used

PENETRON ADMIX SB

PENETRON ADMIX SB

Crystalline Waterproofing


Back to Projects