Water Treatment & Storage

Four Rivers Sanitation Authority Primary Filtration System

Rockford, Il, USA

Description

The Rockford Primary Filtration project was completed by Williams Brothers Construction, the general contractor, and comprised:

  • Four primary filtration influent pumps located in a wet well
  • Two primary cloth media disk filter units with backwash pumps, waste solids pumps, valving, and piping
  • Gravity thickener with two primary filtration thickened sludge pumps
  • Scum pump wet well with a scum pump
  • Primary filter effluent flow split structure

Products Used

About 2,000 yds3 of PENETRON ADMIX SB-treated concrete mix was used for all concrete structures exposed to stormwater run-off and effluent. Delivered in pre-measured soluble bags, PENETRON ADMIX SB is added to the concrete mix during the batching phase. Once part of the mix, the admixture creates a non-soluble crystalline network, which forms throughout the pores and capillary tracts of the concrete to reduce concrete permeability and increase resistance to the chemicals and aggressive compounds found in wastewater.


Related Media Releases


December 31, 2023

Penetron Adds Durability to Innovative Illinois Wastewater Filtration System


Back to Projects

Products Used

PENETRON ADMIX SB

PENETRON ADMIX SB

Crystalline Waterproofing


Back to Projects