Description
Designed by G. Ben Turnipseed Engineers, the $12.7 million Keg Creek WPCP provides a 1.0 million gallon per day capacity and comprises a raw sewage pump station, mechanical bar screen, grit separator, aeration basin, two clarifiers, tertiary filters, UV disinfection process, effluent pump station, aerobic digester, and sludge dewatering system.
Products Used
When added to concrete, the active ingredients in PENETRON ADMIX SB react with water and byproducts of the cement hydration process to form insoluble crystals that fill capillaries, micro-cracks, and pores within the concrete. This network of crystals blocks the pathways for water and harmful chemicals – and enables the self-sealing of new microcracks. This greatly reduces the risk of corrosion and chemical attack, ensuring the durability and longevity of concrete structures in challenging wastewater environments.
Related Media Releases
December 26, 2024