Description
The Louis Armstrong Airport added five gates to the new North Terminal. The approximately 820,000 square-foot terminal now features 35 gates, 2 new concourses, a 2,200-car parking garage, a central utility plant and a ground transportation hub.
Products Used
PENETRON ADMIX was chosen as a waterproofing solution for the North Terminal project. Over 500 cubic yards (380 m3) of concrete treated with PENETRON ADMIX for the below grade elevator pits and footings in the airport’s new North Terminal. Added during batching, PENETRON ADMIX can significantly increase concrete durability and service life.
Related Media Releases
February 22, 2018