Description
The new $65 million Franklin, Kentucky facility produces aluminum ingot slabs for Matalco, a large independent secondary aluminum billet producer. The plants burners within the furnace can process 52,000 lbs. of cold scrap aluminum per hour — equivalent to consuming nearly ten Chevy Tahoe SUVs every hour.
Products Used
Constructed by the Michaels Group, the Matalco plant specified PENETRON ADMIX SB to protect the press pits from high groundwater levels at the site. Over 2,500 yds3 of concrete were treated.