Description
The newly completed 2nd stage of construction comprises 214 apartments housed in five buildings, each 4-9 floors tall, as well as a community pavilion open to the public. Once all construction phases are completed by the end of 2025, NINE by Mirvac will offer a total of 442 residential units of one-, two- and three-bedroom apartments and penthouses (layouts of 58-126 m2 / 538-1,390 ft2) housed in 10 buildings. The project also includes a 1,000 m2 (11,000 ft2) retail and commercial building, and a 6,500 m2 (71,500 ft2) landscaped public park with sheltered BBQ courts and a children’s playground, which incorporates recycled materials from the landmark 233 m (770 ft) high transmission tower (dismantled as part of the development).
Products Used
PENETRON ADMIX, a crystalline waterproofing admixture, was ultimately specified as the most reliable concrete waterproofing solution. Holcim, the ready-mix concrete supplier, delivered several hundred cubic meters of concrete to the various parts of the construction site, which was placed by Azzurri Concrete
Related Media Releases
July 16, 2024