The city of Napoleon was mandated by the Ohio Environmental Protection Agency to construct an upgraded 2.5-million-gallon (MG) equalization basin to comply with environmental regulations. Enhancements included a 30 MGD screw pump facility, a 10 MGD UV-disinfection facility, a 15 MGD final effluent pumping facility, and an overflow weir and baffle specifically designed so the basin can provide primary equivalent treatment in case of an overflow. Sized to handle overflows, the integrated UV system allows treatment of the combined sewer overflow discharge rather than sending it into the river.
Products Used
Brothers Concrete, the ready-mix concrete supplier, added PENETRON ADMIX SB to the concrete mix as the optimal concrete waterproofing solution.