Description
A critical part of the region’s public utility infrastructure, the original North Aurora pump station was built in the 1960s and due to increasingly frequent repairs and maintenance, was nearing the end of its service life. It was designed to collect and lift untreated sewage in a pressurized main from below the Fox River to the gravity North Aurora interceptor many feet in elevation above the influent sewer. It provided service to 8,000 residents of North Aurora and over 14,500 residents of Kane and DuPage counties.
Products Used
Narvick Brothers Ready Mix Concrete added Penetron’s antimicrobial admixture and crystalline waterproofing admixture, PENETRON ADMIX SB, to the concrete mix for all concrete elements of the pump station, connection points with existing force mains, and the final gravity sewer line. PENETRON ADMIX SB was added to the concrete to not only waterproof the concrete but also provide much needed reinforcing corrosion mitigation and increase the service life of the concrete by substantially slowing the aging of the concrete.
Related Media Releases
August 29, 2023