Description
The new potassium ore manufacturing plant in Turkemenistan is predicted to have over 1.4 million tons of output. The new venture is going to be one of the largest industrial zones in Central Asia large enough to satisfy the demand of potassium fertilizers in Turkmenistan and neighboring countries.
Products Used
Over 80 tons of PENETRON ADMIX was used to ensure impermeability in the shafts that were originally treated with other materials and failed to resist the amount of daily water pressure. The shafts were permanently leaking, so the PENETRON System was used to treat all the old shafts. New construction will be treated with PENETRON ADMIX.