Description
Last year, construction began on the Rayar Aqua Park, the newest addition to the LTI Mahdia Beach Hotel complex. The project included: Six giant water toboggan runs (>17m/>55 feet high), a 600m2 wave pool, a man-made river for canoes & kayaks, a 300m2 swimming pool, a pirate ship with seven water toboggan runs and a 500m2 swimming pool, and four water slides.
Products Used
The ready-mix supplier for the Rayar Aqua Park project, added PENETRON ADMIX to the concrete mix destined for all the swimming pools and the river section. While PENEPLUG, a rapid-setting, crystalline-based compound was used to plug the active leaks resulting from the localized hydrostatic pressure, PENETRON topical material and PENECRETE MORTAR were topically applied to all the concrete surfaces exposed to the outdoors.
Related Media Releases
July 1, 2019