Description
The $32 million project was designed by Oertel Architects, an architectural group specialized in public works facilities, and AE2S Services, a structural engineering firm. The new 3.5 MGD, 26,000 ft2 water treatment plant also comprises a new centralized lime softening water treatment plant to improve the quality of the region’s notoriously hard water. This also benefits the environment by reducing the amount of salt (from home softeners) that is typically released into the waterways.
Products Used
PENETRON ADMIX SB-treated concrete is impermeable, stopping water and harmful elements from entering the concrete, even under the constant hydrostatic pressure encountered with a water treatment plant. Its ability to permanently self-heal any microcracks prevents any damage from occurring for the life of the concrete.
Related Media Releases
August 11, 2022