Description
Designed by MBC Group consultants and built by Mainbrace Construction, the AUS$ 11.4 million (US$ 7.6 million) facility now houses 650 storage units on 6,500 m2 (71,500 ft2) of space. Due to the high groundwater levels encountered at the construction site, Mainbrace Construction mandated that Penetron Australia provide a reliable concrete waterproofing solution to protect all below-grade concrete structures of the new facility.
Products Used
To optimize the durability of the concrete structure, Mainbrace used PENETRON ADMIX for all below-grade concrete, including the foundation slab and basement structures. PENEBAR SW swellable waterstop strips were also installed to permanently waterproof the construction joints.